Issuance of an Environmental Permit for Low Environmental Impact Construction (Type-III)
Service Description
This service allows companies and institutions to issue an environmental permit for construction
Service Duration
15 Days
Terms of Service
No Service Requirements
Service requirements
- Environmental Survey Questionnaire (ESQ) Template
- Fill out the environmental forms included in the second volume if (The presence of industrial waste water/the presence of ovens (fuel oil / diesel / gas)/presence of chemicals (raw/products))
- A pledge to implement the control wells within (180 days) from the issuance of the permit.
- Fill out the attached forms